§ 63.855. Alternative emissions limits for co-controlled new and existing anode bake furnaces.

373 words·~2 min read·/us/cfr/t40/s§ 63.855·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

(a)Applicability. The owner or operator of a new anode bake furnace meeting the criteria of paragraphs (a)(1) and
(2)of this section may demonstrate compliance with alternative TF and POM emission limits according to the procedures of this section.
(1)The new anode bake furnace must have been permitted to operate prior to May 1, 1998; and
(2)The new anode bake furnace must share a common control device with one or more existing anode bake furnaces.
(b)TF emission limit.
(1)Prior to the date on which each TF emission test is required to be conducted, the owner or operator must determine the applicable TF emission limit using Equation 6-A, Where: LTFC = Combined emission limit for TF, lb/ton green anode material placed in the bake furnace; LTFE = TF limit for emission averaging for the total number of new and existing anode bake furnaces from Table 4 to this subpart; PE = Mass of green anode placed in existing anode bake furnaces in the twelve months preceding the compliance test, ton/year; and PN = Mass of green anode placed in new anode bake furnaces in the twelve months preceding the compliance test, ton/year.
(2)The owner or operator of a new anode bake furnace that is controlled by a control device that also controls emissions of TF from one or more existing anode bake furnaces must not discharge, or cause to be discharged into the atmosphere, any emissions of TF in excess of the emission limits established in paragraph (b)(1) of this section.
(c)POM emission limits.
(1)Prior to the date on which each POM emission test is required to be conducted, the owner or operator must determine the applicable POM emission limit using Equation 6-B, Where: LPOMC = Combined emission limit for POM, lb/ton green anode material placed in the bake furnace.
(2)The owner or operator of a new anode bake furnace that is controlled by a control device that also controls emissions of POM from one or more existing anode bake furnaces must not discharge, or cause to be discharged into the atmosphere, any emissions of TF in excess of the emission limits established in paragraph (c)(1) of this section. [80 FR 62423, Oct. 15, 2015]
Connections1 cite this
Cited by 1 section
Citation graph
cites case law
§ 63.855
Alternative emissions limits for co-controlled new and existing anode bake furnaces.
Fed. Reg.×1
Cites 0Cited by 1 across 1 source
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.